Industry: Mechanical Engineering (Germany)
Role: Consultant and expert, software architect
Initial situation: Investigation on the sustainability of a proprietary software for change management as well as for planning and documentation of construction sites on an industrial scale
Binding recommendations or guidelines for the development of automatic software control systems
Goals achieved: Design of a tool for knowledge extraction from the meta-dataset of the client software. Revealing connections between old and new configurations
Development of an improved test methodology consisting of regression and process chain tests
Development of a new strategic direction for the client
Job description: Analysis of the existing software and the configuration process, consulting in the client's international team, prototyping of an analysis tool, briefing of the management.
iTWOsite, Microsoft SQL Server
Industry: Textiles, retail, one of the largest webshops in Europe
Role: Expert and consultant, project management support
Initial situation: An extensive database cluster based on Microsoft SQL Server was to be equipped with a novel, flexible replication architecture tailored to specific customer needs based on the database's own Service Broker be provided.
Goals achieved: The prerequisites for the service broker architecture were analysed and the architecture was also implemented. The development of docking system components was adapted and implemented as planned by trained application development teams.
Job description: Development of the database architecture, analysis and validation of the system behaviour, coaching of the software development teams, project management, risk analysis and assessment according to FMEA.
Escalation management, contingency plans / contingency planning, Microsoft SQL Server, replication, data warehouse, service broker, FMEA matrix, project management, phased switchover/cutover with significant performance and stability considerations.
Industry: Telecommunications (Germany)
Role: Sub-project manager server/storage in an extensive migration project
Initial situationA complete IT infrastructure with approx. 1800 workstations in the call centre and group reporting areas as well as approx. 14 server systems and applications was to be migrated from one IT service provider to a new IT service provider. The server/storage sub-project was highly relevant and complex, also with regard to process issues.
Goals achieved: The infrastructure was migrated step by step as planned and is subsequently being used successfully.
Special focus:
Switchover/cutover of approx. 14 live systems, IT governance, provider management, escalation management, emergency plans / contingency planning, Windows Server 2012, VDI environments, desktop virtualisation, MS SQL Server, MySQL, Oracle, data warehousing, project management
Nutze unseren KI-Bot, um gezielt Fragen zu diesem Dienstleister zu stellen, Inspiration für dein Projekt zu sammeln oder passende Alternativen zu finden. Schnell, einfach und rund um die Uhr für dich da!
Comment
The cooperation with Biencore Systems was very good. During the analysis phase, a regular review of the interim results was important to us.
The results have brought us further.